2024
Palm Kernel Project - (Palm Oil Plantation)
Jambi - Sumatera
SCOPE OF WORK
On Site Investigation
- Topography
- Bathymetry
- Soil Investigation (onshore and offshore)
- Oceanography (current and wave investigation)
- River Tidal
Design Phase
- Port and maritime development Consultancy (Feasibility and Master Plan)
- Design and analysis of 30.000 DWT jetty including Dolphin, Mooring, and Berthing.
- Operational flow from Land Transportation, storage tank, loading the CPO trough piping installation to the Tanker Ship / Vessel.
- Operational supporting facilities
- Warehouse, workshop, camp for staff and non-staff.
- Bill of quantity and Tender Document
Engineering Disciplines Involved
- Jetty Engineer
- Civil Engineer
- Piping Engineer
- Firefighting Engineer
- Mechanical Engineer
- Electrical Engineer
- Instrumentation Engineer