Cart Total Items (0)

Cart

  • We care for your asset

2024

Jambi – Sumatera

Engineering Consultancy: CPO Mill and Port

Some Feature Images

SCOPE OF WORK

On Site Investigation:
  • Topography
  • Bathymetry
  • Soil Investigation (onshore and offshore)
  • Oceanography (current and wave investigation)
  • River Tidal.
Design Phase:
  • Port and Maritime Development Consultancy (Feasibility and Master Plan).
  • Design and Analysis of 30,000 DWT Jetty
  • including Dolphin, Mooring, and Berthing.
  • Operational Flow from Land Transportation,
  • storage tank, loading the CPO through piping installation to the Tanker Ship/Vessel.
  • Operational Supporting Facilities
  • Warehouse, Workshop, Camp for staff and non-staff.
  • Bill of Quantity and Tender Document.
Engineering Disciplines Involved:
  • Jetty Engineer
  • Civil Engineer
  • Piping Engineer
  • Mechanical Engineer
  • Electrical Engineer
  • Instrumentation Engineer.