2024 Jambi – Sumatera Engineering Consultancy: CPO Mill and Port Some Feature Images SCOPE OF WORK On Site Investigation: Topography Bathymetry Soil Investigation (onshore and offshore) Oceanography (current and wave investigation) River Tidal. Design Phase: Port and Maritime Development Consultancy (Feasibility and Master Plan). Design and Analysis of 30,000 DWT Jetty including Dolphin, Mooring, and Berthing. Operational Flow from Land Transportation, storage tank, loading the CPO through piping installation to the Tanker Ship/Vessel. Operational Supporting Facilities Warehouse, Workshop, Camp for staff and non-staff. Bill of Quantity and Tender Document. Engineering Disciplines Involved: Jetty Engineer Civil Engineer Piping Engineer Mechanical Engineer Electrical Engineer Instrumentation Engineer.