Engineering Consultancy: CPO Mill and Port
Scope Of Work
On Site Investigation:
- Topography
- Bathymetry
- Soil Investigation (onshore and offshore)
- Oceanography (current and wave investigation)
- River Tidal.
Design Phase:
- Port and Maritime Development Consultancy (Feasibility and Master Plan).
- Design and Analysis of 30,000 DWT Jetty including Dolphin, Mooring, and Berthing.
- Operational Flow from Land Transportation, storage tank, loading the CPO through piping installation to the Tanker Ship/Vessel.
- Operational Supporting Facilities
- Warehouse, Workshop, Camp for staff and non-staff.
- Bill of Quantity and Tender Document.
Engineering Disciplines Involved:
- Jetty Engineer
- Civil Engineer
- Piping Engineer
- Mechanical Engineer
- Electrical Engineer
- Instrumentation Engineer.