2021
EPCM NPK FERTILIZER
Fertilizer Plant (Mojosari & Pontianak)
SCOPE OF WORK
Related Project news
EPCM Consultancy
- Soil Work Investigation
- Pilling Analysis
- Technical study and detailed engineering design.
- Bill of quantity for construction
- Detailed design and specification of the plant
- Design layout mapping
Engineering Disciplines Involved
- Civil
- Mechanical
- Process
- Automation
- Electrical
- Instrumentation
Major Equipment’s Manufactured Inhouse.
- Mixer Rotary
- Drum Granulator
- Rotary Drum
- Coatery Rotary Drum
- Drum Boiler
- 25 Conveyor System
- Vibration Screen
- Chimney
- Refractory
SCOPE OF WORK
Auxiliary Equipment
- Pumping package
- Ducting Package
- Scrubber Package
- Hopper Weighing
- Automated Bagging System
Structure & Civil Works On Site
- Survey Elevation & Excavation
- Rebar & Form Works
- Mobile Batching Plant (Cement, Sand & Gravel)
- Pre Assembly
- Anchoring & Installation of Structure
- Mechanical & Electrical Installation
Test Commissioning
- Dry Test
- Wet Test
- 2 Years Performance Warranty