PT Rexline Engineering Indonesia
Made In Indonesia · EPC Specialists

ProjectExperience

From 3 km overland conveyors and 10,000 DWT jetties to mining camps, process plants and hauling roads, Rexline delivers engineering, fabrication and project execution across Indonesia and selected international markets.

EPCMiningMarineIndustrialInfrastructureMade in Indonesia
Project Showcase Video
32
Project references
9
Indonesian provinces and Timor-Leste
750+
Engineers, technicians and field personnel across Indonesia
2026
Edition
Company Overview

One Organisation From Design To Handover

PT Rexline Engineering Indonesia designs, engineers, procures, fabricates, constructs and commissions critical infrastructure for mining, energy and industry. Member of an Australian engineering group, with a head office in Surabaya and an owned heavy fabrication facility in Lamongan, East Java.

Rexline project site

What we deliver

  • Bulk material handling and conveyor systems
  • Transfer stations, crushing and screening
  • Jetties, ports and marine structures
  • Storage tanks and fuel systems
  • Workshops, warehouses and industrial buildings
  • Remote camps and housing
  • Hauling roads, fencing and civil works
  • Process plants and engineered equipment

Sectors

  • Mining: coal, copper, gold, nickel, limestone
  • Ports, jetties and bulk terminals
  • Power generation
  • Fertilizer, agro and plantation
  • Fuel and energy storage
  • Cement, chemicals and heavy industry

Workforce

  • 750+ engineers, technicians and field personnel across Indonesia
  • Civil, structural, mechanical, electrical, instrumentation and process engineers in-house

Engineering tools

  • SAP2000 (structure and piling)
  • Tekla Structures (detailing)
  • SolidWorks, Kyro (mechanical)
  • Helix (conveyor design)
  • AutoCAD, Civil 3D, SketchUp

Certification

  • ISO 9001:2015, ISO 45001:2018, ISO 14001:2015
  • SBU construction and consultancy certificates
  • Port construction standard certificate (KBLI 42912)
  • View the certificates
Company Overview

Fabrication Facility, Lamongan

Rexline shop-details, cuts, welds, coats and dispatches its own structures, then erects them. Conveyor structures, tank components, rampdoors, tripper cars and building frames in this document were produced here.

Rexline fabrication facility, LamonganRexline fabrication facility, LamonganRexline fabrication facility, LamonganRexline fabrication facility, LamonganRexline fabrication facility, Lamongan
3 km Overland Coal Conveyor
Project 01 / 32
Bulk Materials Handling, Ports & Marine

3 km Overland Coal Conveyor

Sebalang, Lampung
Role
EPCM
Key parameters
3.0 km conveyor; 950 t fabricated in-house

Engineering

  • Soil inspection and foundation design
  • Technical study and detailed engineering drawings
  • Complete conveyor design and specification
  • Bill of quantity for construction
  • Civil, mechanical, electrical, instrumentation and fire fighting

Fabrication & supply

  • 950 t steelwork, platework and rebar, 100% made in Indonesia
  • Rollers, pulleys and brackets
  • Drive system, roller system and belt
  • Belt weighing system

Construction & commissioning

  • Survey, elevation and excavation; rebar and formwork
  • Mobile batching plant on the alignment
  • Pre-assembly, anchoring and structural erection
  • Mechanical and electrical installation
  • Dry and wet test commissioning
01
Marine trestle, stockyard and transfer points
Sebalang, Lampung
3 km Overland Coal Conveyor — Marine trestle, stockyard and transfer points3 km Overland Coal Conveyor — Marine trestle, stockyard and transfer points3 km Overland Coal Conveyor — Marine trestle, stockyard and transfer points3 km Overland Coal Conveyor — Marine trestle, stockyard and transfer points3 km Overland Coal Conveyor — Marine trestle, stockyard and transfer points
01
Erection, galleries and live-line inspection
Sebalang, Lampung
3 km Overland Coal Conveyor — Erection, galleries and live-line inspection3 km Overland Coal Conveyor — Erection, galleries and live-line inspection3 km Overland Coal Conveyor — Erection, galleries and live-line inspection3 km Overland Coal Conveyor — Erection, galleries and live-line inspection3 km Overland Coal Conveyor — Erection, galleries and live-line inspection3 km Overland Coal Conveyor — Erection, galleries and live-line inspection
1.1 km Barge Loading Conveyor & Jetty
Project 02 / 32
Bulk Materials Handling, Ports & Marine

1.1 km Barge Loading Conveyor & Jetty

Batu Tuhup, Central Kalimantan
Role
EPCM
Key parameters
1.1 km conveyor; 853 t fabricated
Period
2023

Engineering

  • Topography and bathymetry
  • Soil investigation and piling analysis
  • Jetty design and structural analysis
  • Barge loading conveyor system design
  • Drawings, specification, BOQ and cost estimate

Fabrication & marine works

  • 853 t steelwork and rebar, piling and piping, conveyor structure
  • Piling by hammer and boat methodology
  • Pile bracing (welded), pile cap and fender installation
  • Platform installation and anchoring

Construction & commissioning

  • Survey, elevation and excavation; rebar and formwork
  • Mobile batching plant
  • Pre-assembly, anchoring and erection
  • Mechanical and electrical installation
  • Dry and wet test commissioning
02
Marine works, conveyor foundations and site overview
Batu Tuhup, Central Kalimantan
1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview1.1 km Barge Loading Conveyor & Jetty — Marine works, conveyor foundations and site overview
Project 03 / 32
Bulk Materials Handling, Ports & Marine

10,000 DWT Jetty & 1,000 TPH Barge Loader

Central Kalimantan
Role
EPC
Key parameters
10,000 DWT vessel class; 1,000 TPH
Period
2019

Marine

  • River jetty engineered for Kalimantan soil and current
  • Dolphins, mooring and fendering
  • Piling by hammer and boat methodology; pile caps and platform

Materials handling

  • Turnkey 1,000 TPH barge loading conveyor
  • AR-lined impact-resistant hopper for mining dump trucks
  • Reinforced retaining wall to hopper area

Delivery

  • Barge and limited-road transport of oversized modules
  • Pre-assembly, anchoring and erection
  • Mechanical and electrical installation
10,000 DWT Jetty & 1,000 TPH Barge Loader10,000 DWT Jetty & 1,000 TPH Barge Loader10,000 DWT Jetty & 1,000 TPH Barge Loader10,000 DWT Jetty & 1,000 TPH Barge Loader10,000 DWT Jetty & 1,000 TPH Barge Loader
Multi-Purpose Cargo Jetty
Project 04 / 32
Bulk Materials Handling, Ports & Marine

Multi-Purpose Cargo Jetty

Merauke, South Papua
Under construction
Role
EPC
Key parameters
River cargo jetty with fendering
Period
2026

Engineering

  • Jetty layout and structural design
  • Fender frame design
  • Construction methodology for river works

Fabrication

  • Fender frames fabricated and coated
  • Structural steel for the jetty works

Construction

  • Barge-based marine works
  • Piling and fender installation
  • Site works by Rexline crews
04
Fender-frame fabrication, bracing and protective coating
Merauke, South Papua
Multi-Purpose Cargo Jetty — Fender-frame fabrication, bracing and protective coatingMulti-Purpose Cargo Jetty — Fender-frame fabrication, bracing and protective coating
04
Marine fender installation and river cargo interface
Merauke, South Papua
Multi-Purpose Cargo Jetty — Marine fender installation and river cargo interfaceMulti-Purpose Cargo Jetty — Marine fender installation and river cargo interfaceMulti-Purpose Cargo Jetty — Marine fender installation and river cargo interface
Marine Tower Crane Foundation & Erection
Project 05 / 32
Bulk Materials Handling, Ports & Marine

Marine Tower Crane Foundation & Erection

Merauke, South Papua
Under construction
Role
EPC (design & build)
Key parameters
30 m tower crane; 20 t at 30 m tip; 360° slewing
Period
2026

Engineering

  • Crane foundation design
  • Tower section and base assembly planning
  • Lifting plans for erection

Fabrication & supply

  • Tower sections and base frames prepared on site
  • Coating and assembly

Construction

  • Foundation excavation, rebar and formwork
  • Base embedment and concrete works
  • Erection of tower sections by mobile crane
05
Fabricated jib assembly and Rexline operator-cabin installation
Merauke, South Papua
Marine Tower Crane Foundation & Erection — Fabricated jib assembly and Rexline operator-cabin installationMarine Tower Crane Foundation & Erection — Fabricated jib assembly and Rexline operator-cabin installation
05
Starter-mast foundation and slewing-platform assembly
Merauke, South Papua
Marine Tower Crane Foundation & Erection — Starter-mast foundation and slewing-platform assemblyMarine Tower Crane Foundation & Erection — Starter-mast foundation and slewing-platform assembly
NPK Fertilizer Plant
Project 06 / 32
Process Plants

NPK Fertilizer Plant

Mojosari, East Java
Role
EPCM
Key parameters
3.4 m × 36 m rotary drum; 25 conveyors
Period
2022–2023

Engineering

  • Soil investigation and piling analysis
  • Technical study and detailed engineering
  • Plant specification and layout mapping
  • Civil, mechanical, process, automation, electrical, instrumentation

Manufactured in-house

  • Mixer rotary and drum granulator
  • Rotary drum 3.4 m dia × 36 m long
  • Coating rotary drum and drum boiler
  • 25-unit conveyor system
  • Vibrating screen, chimney and refractory

Supply & construction

  • Pumping, ducting and scrubber packages
  • Hopper weighing and automated bagging
  • Civil works and mobile batching
  • Erection, installation, dry and wet tests
06
Rotary-drum fabrication and heavy-lift installation
Mojosari, East Java
NPK Fertilizer Plant — Rotary-drum fabrication and heavy-lift installationNPK Fertilizer Plant — Rotary-drum fabrication and heavy-lift installation
06
Screening equipment, structural steel and process ductwork
Mojosari, East Java
NPK Fertilizer Plant — Screening equipment, structural steel and process ductworkNPK Fertilizer Plant — Screening equipment, structural steel and process ductwork
06
Conveyor integration and process-drive equipment
Mojosari, East Java
NPK Fertilizer Plant — Conveyor integration and process-drive equipmentNPK Fertilizer Plant — Conveyor integration and process-drive equipment
Briquette Heater Station
Project 07 / 32
Process Plants

Briquette Heater Station

Mojosari, East Java
Role
Design & build
Key parameters
10–50 kW; holds NPK storage below 60% RH
Period
2023

Design basis

  • Briquette (solid fuel) heater
  • Heat output 10–50 kW
  • Airflow 500–2,000 m³/h forced convection
  • Thermostat control 40–60 °C

Performance

  • 20–40% RH reduction in storage/production areas
  • Briquette consumption 1–5 kg/h
  • Overheat protection and fuel level monitoring

Layout

  • Station located at NPK storage
  • Ventilation and airflow paths
  • Thermostat and humidity sensors
  • Fuel storage and handling area
07
Heater, drying conveyors and ducting
Mojosari, East Java
Briquette Heater Station — Heater, drying conveyors and ductingBriquette Heater Station — Heater, drying conveyors and ductingBriquette Heater Station — Heater, drying conveyors and ductingBriquette Heater Station — Heater, drying conveyors and ductingBriquette Heater Station — Heater, drying conveyors and ductingBriquette Heater Station — Heater, drying conveyors and ducting
Crusher Plant
Project 08 / 32
Process Plants

Crusher Plant

Kalimantan
Role
EPCM
Key parameters
Primary and secondary crushing circuit

Engineering

  • Civil, structural, mechanical and electrical design

Fabrication

  • Structural steelwork, platework and rebar in-house

Construction

  • On-site foundation civil works
  • Installation of primary and secondary crusher system
  • Commissioning tests
Hot Water Treatment Plant for Sugarcane Seed
Project 09 / 32
Process Plants

Hot Water Treatment Plant for Sugarcane Seed

Merauke, South Papua
Role
EPC
Key parameters
PLC/HMI-controlled thermal treatment
Period
2026

Engineering & automation

  • Process engineering for thermal seed treatment
  • PFDs, P&IDs, layouts and control philosophy
  • MEI engineering; PLC, HMI, interlocks and alarms

Procurement & fabrication

  • Boiler and heating system supply and integration
  • Treatment tanks and thermal vessels
  • Pumps, valves, piping, insulation and instrumentation

Construction & start-up

  • Mechanical, electrical and instrumentation installation
  • Loop checking and calibration
  • Cold and hot commissioning, performance tests
  • Operator training and documentation
09
Treatment canal and process piping
Merauke, South Papua
Hot Water Treatment Plant for Sugarcane Seed — Treatment canal and process pipingHot Water Treatment Plant for Sugarcane Seed — Treatment canal and process piping
09
Boiler systems and elevated water vessel
Merauke, South Papua
Hot Water Treatment Plant for Sugarcane Seed — Boiler systems and elevated water vesselHot Water Treatment Plant for Sugarcane Seed — Boiler systems and elevated water vessel
09
Electrical controls, process equipment and water storage
Merauke, South Papua
Hot Water Treatment Plant for Sugarcane Seed — Electrical controls, process equipment and water storageHot Water Treatment Plant for Sugarcane Seed — Electrical controls, process equipment and water storageHot Water Treatment Plant for Sugarcane Seed — Electrical controls, process equipment and water storage
Descaling Acidic Tank
Project 10 / 32
Process Plants

Descaling Acidic Tank

Gresik, East Java
Role
Engineering & services
Key parameters
8,000 m³ tank; hazardous location
Period
2021

Engineering

  • Descaling methodology for an 8,000 m³ tank
  • Conveyor system methodology for removal
  • Hazardous location work planning

Execution

  • Excavation of scale inside the tank
  • Material removal by conveyor
  • Site containment and handling

HSE

  • Work in an operating process plant
  • Hazardous location controls
10
Tank and plant interfaces
Gresik, East Java
Descaling Acidic Tank — Tank and plant interfacesDescaling Acidic Tank — Tank and plant interfacesDescaling Acidic Tank — Tank and plant interfacesDescaling Acidic Tank — Tank and plant interfacesDescaling Acidic Tank — Tank and plant interfaces
10
Works inside the tank
Gresik, East Java
Descaling Acidic Tank — Works inside the tankDescaling Acidic Tank — Works inside the tankDescaling Acidic Tank — Works inside the tankDescaling Acidic Tank — Works inside the tank
2,000 kL Fuel Storage & Distribution Facility
Project 11 / 32
Fuel Storage & Distribution

2,000 kL Fuel Storage & Distribution Facility

Merauke, South Papua
Role
EPCM
Key parameters
4 × 500 kL tanks; hydrant fire protection; SCADA
Period
2025–2026

Engineering

  • Engineering design documentation
  • Transfer pump 80 m³/h at 31 m
  • Electric and diesel fire pumps 57 m³/h at 118 m
  • Jockey pump 12 m³/h at 23.6 m

Construction

  • Tank foundations and erection
  • Fuel transfer piping network
  • Hydrant fire protection system
  • Bund walls and filling station

Electrical & controls

  • Power distribution
  • Instrumentation and control systems
  • SCADA monitoring
  • System integration and commissioning
11
Tank-top access and storage-tank arrangement
Merauke, South Papua
2,000 kL Fuel Storage & Distribution Facility — Tank-top access and storage-tank arrangement2,000 kL Fuel Storage & Distribution Facility — Tank-top access and storage-tank arrangement
11
Transfer manifolds, actuated valves and tank connections
Merauke, South Papua
2,000 kL Fuel Storage & Distribution Facility — Transfer manifolds, actuated valves and tank connections2,000 kL Fuel Storage & Distribution Facility — Transfer manifolds, actuated valves and tank connections
11
Interconnecting pipework and hydrant access
Merauke, South Papua
2,000 kL Fuel Storage & Distribution Facility — Interconnecting pipework and hydrant access2,000 kL Fuel Storage & Distribution Facility — Interconnecting pipework and hydrant access
11
Fuel loading station and tanker filling bays
Merauke, South Papua
2,000 kL Fuel Storage & Distribution Facility — Fuel loading station and tanker filling bays2,000 kL Fuel Storage & Distribution Facility — Fuel loading station and tanker filling bays
11
Control room and supporting utility facilities
Merauke, South Papua
2,000 kL Fuel Storage & Distribution Facility — Control room and supporting utility facilities2,000 kL Fuel Storage & Distribution Facility — Control room and supporting utility facilities
Fuel Farm Facility
Project 12 / 32
Fuel Storage & Distribution

Fuel Farm Facility

Central Kalimantan
Role
EPC
Key parameters
200 kL (4 × 50 kL)

Engineering

  • Engineering design documentation
  • Civil foundation and counter-spillage wall

Construction

  • Tank installation
  • Fuel transfer piping
  • Hydrant fire protection
  • Loading and unloading facility

Electrical

  • Power distribution
  • Instrumentation and control
  • Commissioning
12
Installation, piping and welding
Central Kalimantan
Fuel Farm Facility — Installation, piping and weldingFuel Farm Facility — Installation, piping and weldingFuel Farm Facility — Installation, piping and weldingFuel Farm Facility — Installation, piping and weldingFuel Farm Facility — Installation, piping and weldingFuel Farm Facility — Installation, piping and welding
ISO Tank Fuel System
Project 13 / 32
Fuel Storage & Distribution

ISO Tank Fuel System

Merauke, South Papua
Role
Design & build
Key parameters
10 sets × 25 kL ISO tanks
Period
2025

Engineering

  • Design and concept development
  • Civil structures and foundations
  • Fuel system and dispensing design

Fabrication

  • Custom-built 25 kL fuel ISO tanks
  • Engineered fuel dispensers
  • Piping and plumbing

Installation

  • Site installation and integration
  • Electrical and instrumentation
13
Installation, piping and welding
Merauke, South Papua
ISO Tank Fuel System — Installation, piping and weldingISO Tank Fuel System — Installation, piping and weldingISO Tank Fuel System — Installation, piping and weldingISO Tank Fuel System — Installation, piping and weldingISO Tank Fuel System — Installation, piping and weldingISO Tank Fuel System — Installation, piping and welding
Containerised Mobile Fuel Tanks
Project 14 / 32
Fuel Storage & Distribution

Containerised Mobile Fuel Tanks

Merauke, South Papua
Role
Design & build
Key parameters
25, 35, 50 and 62 kL; 50+ units delivered
Period
2025

Product

  • Capacities 25, 35, 50 and 62 kL
  • Road and barge transportable
  • TKDN approved

Dispensing

  • Built-in dispenser 40 to 400 LPM
  • Explosion-proof pump
  • Lockable safety door

Assurance

  • Third-party testing available
  • Custom features to order
14
Dispenser bay and pump set
Merauke, South Papua
Containerised Mobile Fuel Tanks — Dispenser bay and pump setContainerised Mobile Fuel Tanks — Dispenser bay and pump setContainerised Mobile Fuel Tanks — Dispenser bay and pump setContainerised Mobile Fuel Tanks — Dispenser bay and pump setContainerised Mobile Fuel Tanks — Dispenser bay and pump setContainerised Mobile Fuel Tanks — Dispenser bay and pump set
T-Workshop Complex, 13,360 m²
Project 15 / 32
Workshops, Warehouses & Industrial Buildings

T-Workshop Complex, 13,360 m²

Merauke, South Papua
Under construction
Role
EPC
Key parameters
4 zones; 6 overhead cranes in Zone A
Period
2026

Zones

  • A: workshop, 6 overhead cranes, 82 × 40 m = 3,280 m²
  • B: fabrication building, 60 × 42 m = 2,520 m²
  • C: tyre shop and warehouse, 60 × 42 m = 2,520 m²
  • D: 3-floor office, 42 × 40 m × 3 = 5,040 m²

Engineering

  • Soil investigation and piling analysis
  • Detailed structural, civil, mechanical and electrical design
  • Specification, BOQ and tender documents

Construction

  • Foundations, rebar and slab works
  • Pre-assembly and steel erection
  • Roofing and cladding
  • Mechanical and electrical installation
15
Roof and cladding, August 2026
Merauke, South Papua
T-Workshop Complex, 13,360 m² — Roof and cladding, August 2026T-Workshop Complex, 13,360 m² — Roof and cladding, August 2026T-Workshop Complex, 13,360 m² — Roof and cladding, August 2026T-Workshop Complex, 13,360 m² — Roof and cladding, August 2026T-Workshop Complex, 13,360 m² — Roof and cladding, August 2026
15
Finished bays, cladding and floor preparation
Merauke, South Papua
T-Workshop Complex, 13,360 m² — Finished bays, cladding and floor preparationT-Workshop Complex, 13,360 m² — Finished bays, cladding and floor preparationT-Workshop Complex, 13,360 m² — Finished bays, cladding and floor preparationT-Workshop Complex, 13,360 m² — Finished bays, cladding and floor preparationT-Workshop Complex, 13,360 m² — Finished bays, cladding and floor preparation
15
Steel erection
Merauke, South Papua
T-Workshop Complex, 13,360 m² — Steel erectionT-Workshop Complex, 13,360 m² — Steel erectionT-Workshop Complex, 13,360 m² — Steel erectionT-Workshop Complex, 13,360 m² — Steel erectionT-Workshop Complex, 13,360 m² — Steel erectionT-Workshop Complex, 13,360 m² — Steel erection
15
Foundations and slab works
Merauke, South Papua
T-Workshop Complex, 13,360 m² — Foundations and slab worksT-Workshop Complex, 13,360 m² — Foundations and slab worksT-Workshop Complex, 13,360 m² — Foundations and slab worksT-Workshop Complex, 13,360 m² — Foundations and slab worksT-Workshop Complex, 13,360 m² — Foundations and slab works
Project 16 / 32
Workshops, Warehouses & Industrial Buildings

Permanent Workshop, Office & Support Facilities

Palu, Central Sulawesi
Role
EPC
Key parameters
1,200 m² warehouse; B3 storage; 7 facilities
Period
2025–2026

Facilities

  • Workshop bay, workshop office and ready lane
  • Oil and B3 storage; Epiroc equipment storage
  • Small tyre repair workshop and wash bay
  • Storeroom

Works

  • Survey, elevation and excavation
  • Bore piling and foundations; mobile batching
  • Pre-assembly, anchoring and erection

Services

  • Mechanical and electrical installation
  • Office fit-out
Permanent Workshop, Office & Support FacilitiesPermanent Workshop, Office & Support FacilitiesPermanent Workshop, Office & Support FacilitiesPermanent Workshop, Office & Support FacilitiesPermanent Workshop, Office & Support Facilities
16
Steel erection, 2025
Palu, Central Sulawesi
Permanent Workshop, Office & Support Facilities — Steel erection, 2025Permanent Workshop, Office & Support Facilities — Steel erection, 2025Permanent Workshop, Office & Support Facilities — Steel erection, 2025Permanent Workshop, Office & Support Facilities — Steel erection, 2025Permanent Workshop, Office & Support Facilities — Steel erection, 2025Permanent Workshop, Office & Support Facilities — Steel erection, 2025
16
Crane runway and roofing
Palu, Central Sulawesi
Permanent Workshop, Office & Support Facilities — Crane runway and roofingPermanent Workshop, Office & Support Facilities — Crane runway and roofingPermanent Workshop, Office & Support Facilities — Crane runway and roofingPermanent Workshop, Office & Support Facilities — Crane runway and roofingPermanent Workshop, Office & Support Facilities — Crane runway and roofingPermanent Workshop, Office & Support Facilities — Crane runway and roofing
16
Office block, fitted out
Palu, Central Sulawesi
Permanent Workshop, Office & Support Facilities — Office block, fitted outPermanent Workshop, Office & Support Facilities — Office block, fitted outPermanent Workshop, Office & Support Facilities — Office block, fitted outPermanent Workshop, Office & Support Facilities — Office block, fitted outPermanent Workshop, Office & Support Facilities — Office block, fitted outPermanent Workshop, Office & Support Facilities — Office block, fitted out
Workshop & Warehouse
Project 17 / 32
Workshops, Warehouses & Industrial Buildings

Workshop & Warehouse

Murung Raya, Central Kalimantan
Role
EPCM
Key parameters
Bore-piled foundations; SAP2000 and Tekla design
Period
2024

Engineering

  • Soil investigation and piling analysis
  • Structural design in SAP2000; Tekla detailing
  • Drawings, specification, BOQ and tender documents

Foundations

  • Bore piling and brick foundation
  • Elevation and excavation; rebar and formwork
  • Truck-mixer concreting

Erection & services

  • Pre-assembly, anchoring and erection
  • Epoxy floor and traffic marking
  • Mechanical and electrical installation
17
Warehouse interior and floor finish
Murung Raya, Central Kalimantan
Workshop & Warehouse — Warehouse interior and floor finishWorkshop & Warehouse — Warehouse interior and floor finishWorkshop & Warehouse — Warehouse interior and floor finishWorkshop & Warehouse — Warehouse interior and floor finishWorkshop & Warehouse — Warehouse interior and floor finish
17
Canopy structure and roof system
Murung Raya, Central Kalimantan
Workshop & Warehouse — Canopy structure and roof systemWorkshop & Warehouse — Canopy structure and roof systemWorkshop & Warehouse — Canopy structure and roof systemWorkshop & Warehouse — Canopy structure and roof systemWorkshop & Warehouse — Canopy structure and roof systemWorkshop & Warehouse — Canopy structure and roof system
Coal Washing Plant Infrastructure
Project 18 / 32
Workshops, Warehouses & Industrial Buildings

Coal Washing Plant Infrastructure

Central Kalimantan
Role
EPCM
Key parameters
Plant building on bore piles
Period
2025

Engineering

  • Soil investigation and piling analysis
  • Detailed engineering design
  • Drawings, specification, BOQ and tender documents

Facilities

  • Storage and spare parts area
  • Restroom, locker area and musholla
  • Parking, oil trap and site drainage

Construction

  • Bore piling and foundations; mobile batching
  • Pre-assembly, anchoring and erection
  • Mechanical and electrical installation
18
Portal frame erection
Central Kalimantan
Coal Washing Plant Infrastructure — Portal frame erectionCoal Washing Plant Infrastructure — Portal frame erectionCoal Washing Plant Infrastructure — Portal frame erectionCoal Washing Plant Infrastructure — Portal frame erectionCoal Washing Plant Infrastructure — Portal frame erectionCoal Washing Plant Infrastructure — Portal frame erection
18
Cladding and building close-out
Central Kalimantan
Coal Washing Plant Infrastructure — Cladding and building close-outCoal Washing Plant Infrastructure — Cladding and building close-outCoal Washing Plant Infrastructure — Cladding and building close-outCoal Washing Plant Infrastructure — Cladding and building close-outCoal Washing Plant Infrastructure — Cladding and building close-outCoal Washing Plant Infrastructure — Cladding and building close-out
Two-Storey Workforce Housing
Project 19 / 32
Workforce Camps & Housing

Two-Storey Workforce Housing

Morowali, Central Sulawesi
Role
EPCM
Key parameters
Container pre-fab blocks with full fit-out
Period
2024

Civil

  • Entire civil works on site
  • Survey, elevation and excavation
  • Rebar and formwork; mobile batching plant

Pre-fabrication

  • Rebar, handrail, steelwork and roofing
  • Container pre-fab installation

Fit-out

  • Mechanical and electrical installation
  • Rooms, ablutions, meeting and kitchen areas
19
Housing blocks and access
Morowali, Central Sulawesi
Two-Storey Workforce Housing — Housing blocks and accessTwo-Storey Workforce Housing — Housing blocks and accessTwo-Storey Workforce Housing — Housing blocks and accessTwo-Storey Workforce Housing — Housing blocks and accessTwo-Storey Workforce Housing — Housing blocks and accessTwo-Storey Workforce Housing — Housing blocks and access
19
Interiors and amenities
Morowali, Central Sulawesi
Two-Storey Workforce Housing — Interiors and amenitiesTwo-Storey Workforce Housing — Interiors and amenitiesTwo-Storey Workforce Housing — Interiors and amenitiesTwo-Storey Workforce Housing — Interiors and amenitiesTwo-Storey Workforce Housing — Interiors and amenitiesTwo-Storey Workforce Housing — Interiors and amenities
Project 20 / 32
Workforce Camps & Housing

Housing Camp & Kitchen

Central Kalimantan
Role
EPCM
Key parameters
Foldable container system with corridors
Period
2023

Structure

  • Foldable container system
  • Platework, rebar, handrail and grating
  • Sandwich panel, roofing and corridors

Civil

  • Survey, elevation and excavation
  • Rebar and formwork; truck-mixer concreting

Services

  • Anchoring and installation
  • Mechanical and electrical installation
Housing Camp & KitchenHousing Camp & KitchenHousing Camp & KitchenHousing Camp & KitchenHousing Camp & Kitchen
20
Blocks, corridors and rooms
Central Kalimantan
Housing Camp & Kitchen — Blocks, corridors and roomsHousing Camp & Kitchen — Blocks, corridors and roomsHousing Camp & Kitchen — Blocks, corridors and roomsHousing Camp & Kitchen — Blocks, corridors and roomsHousing Camp & Kitchen — Blocks, corridors and roomsHousing Camp & Kitchen — Blocks, corridors and rooms
Steel Container Camp
Project 21 / 32
Workforce Camps & Housing

Steel Container Camp

East Kalimantan
Role
EPCM
Key parameters
Two-storey camp from modified 40 ft containers
Period
2023

Design

  • 40 ft containers, each converted to two rooms with toilet
  • Two-storey arrangement with stairs and walkways

Fabrication

  • Container modification in workshop
  • Windows, doors and interior lining

Site

  • Civil works
  • Anchoring and erection
  • Mechanical and electrical installation
21
Container conversion in the workshop
East Kalimantan
Steel Container Camp — Container conversion in the workshopSteel Container Camp — Container conversion in the workshopSteel Container Camp — Container conversion in the workshopSteel Container Camp — Container conversion in the workshopSteel Container Camp — Container conversion in the workshopSteel Container Camp — Container conversion in the workshop
21
Site installation
East Kalimantan
Steel Container Camp — Site installationSteel Container Camp — Site installationSteel Container Camp — Site installationSteel Container Camp — Site installationSteel Container Camp — Site installation
105 km Mining Hauling Roads
Project 22 / 32
Hauling Roads & Civil Works

105 km Mining Hauling Roads

Central Kalimantan (58 km) and Pukun, Sampit (47 km)
Role
Design & build
Key parameters
Two alignments, 58 km + 47 km; 40 t GVW; 300 mm pavement

Design criteria

  • 40 t dump truck gross vehicle weight
  • Road width 8–12 m; grades below 8%
  • CBR curve method (Atkinson, 1992)
  • Subgrade compacted to 95% MPD

Pavement & drainage

  • Base course Gravel C (7/10), about 200 mm, to 98% MPD
  • Surface course Gravel B (2/3), about 100 mm
  • Camber 3–5%; side drains and culverts
  • Clearing, grubbing, cut and fill to profile

Quality control

  • Sieve analysis, Atterberg limits, Proctor and CBR
  • Sand cone or nuclear gauge density tests
  • Level and thickness surveys; as-built drawings
  • Defect monitoring through the liability period
22
Clearing, grading, compaction and completed pavement
Central Kalimantan (58 km) and Pukun, Sampit (47 km)
105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement105 km Mining Hauling Roads — Clearing, grading, compaction and completed pavement
33 km Mining Plant Perimeter Fencing
Project 23 / 32
Hauling Roads & Civil Works

33 km Mining Plant Perimeter Fencing

Central Kalimantan
Role
Design & build
Key parameters
33 km galvanized fence line
Period
2024

Supply

  • Galvanized posts and fence mesh
  • Galvanized barbed wire
  • Cement, sand and gravel

Site works

  • Land clearance
  • Cut and fill
  • Installation

Community

  • Local CSR handled within the contract
23
Completed fence line
Central Kalimantan
33 km Mining Plant Perimeter Fencing — Completed fence line33 km Mining Plant Perimeter Fencing — Completed fence line33 km Mining Plant Perimeter Fencing — Completed fence line33 km Mining Plant Perimeter Fencing — Completed fence line33 km Mining Plant Perimeter Fencing — Completed fence line33 km Mining Plant Perimeter Fencing — Completed fence line
Port Perimeter Wall
Project 24 / 32
Hauling Roads & Civil Works

Port Perimeter Wall

Labuhan Badas, Sumbawa, West Nusa Tenggara
Role
Design & build
Key parameters
Precast panel wall on stone foundation
Period
2024

Design

  • Shop drawings for the perimeter wall and gates
  • Foundation detailing

Construction

  • Land clearance, cut and fill
  • Rubble stone foundation
  • Column reinforcement and formwork
  • Precast panel installation

Community

  • Local CSR and community engagement handled within the contract
24
Foundation and wall construction
Labuhan Badas, Sumbawa, West Nusa Tenggara
Port Perimeter Wall — Foundation and wall constructionPort Perimeter Wall — Foundation and wall constructionPort Perimeter Wall — Foundation and wall constructionPort Perimeter Wall — Foundation and wall constructionPort Perimeter Wall — Foundation and wall constructionPort Perimeter Wall — Foundation and wall construction
Gabion Retaining Wall
Project 25 / 32
Hauling Roads & Civil Works

Gabion Retaining Wall

Pasuruan, East Java
Role
Design & build
Key parameters
Landslide protection on a live river bank
Period
2024

Supply

  • Gabion wire mesh
  • Boulder fill

Works

  • Land clearance
  • Tie-down of gabions to stop landslide
  • Manual boulder loading into mesh

Conditions

  • Executed in live water conditions
  • Stepped landslide-proof wall
25
Works in the river
Pasuruan, East Java
Project 26 / 32
Engineered Equipment

Conveyor Tripper Cars (3 units)

Sumbawa Barat, West Nusa Tenggara
Role
Supply & commissioning
Key parameters
Manufactured to AS 1755:2000
Period
2025

Engineering & fabrication

  • Detailed engineering and fabrication
  • Shop assembly, inspection and testing
  • Delivery

Installation

  • Mechanical assembly and rail alignment
  • Electrical wiring
  • Control integration with the main conveyor

Commissioning & handover

  • Functional tests and load trials
  • Safety verification
  • Datasheets, O&M manuals, as-builts, operator instruction
Conveyor Tripper Cars (3 units)Conveyor Tripper Cars (3 units)Conveyor Tripper Cars (3 units)
Dynamic Weighbridge
Project 27 / 32
Engineered Equipment

Dynamic Weighbridge

Central Kalimantan
Role
Supply & install
Key parameters
Volumetric scanner, load cells, RFID
Period
2026

Survey & installation

  • Site, power and network assessment
  • Volumetric scanner and sensors
  • Weighbridge frame, modules and load cells
  • RFID tags and scanner

Integration

  • Weighbridge and vehicle identification
  • Data and network integration
  • Control room connectivity

Commissioning & handover

  • Functional and measurement verification
  • Operational commissioning
  • Operator training and records
27
Scanner gantry, platform and control room
Central Kalimantan
Dynamic Weighbridge — Scanner gantry, platform and control roomDynamic Weighbridge — Scanner gantry, platform and control roomDynamic Weighbridge — Scanner gantry, platform and control roomDynamic Weighbridge — Scanner gantry, platform and control roomDynamic Weighbridge — Scanner gantry, platform and control roomDynamic Weighbridge — Scanner gantry, platform and control room
50 MTPA Limestone Mining, Crushing & Port FacilityDesign render
Project 28 / 32
Studies, Design & Supervision

50 MTPA Limestone Mining, Crushing & Port Facility

Timor-Leste
Design study
Role
Design & engineering consultant
Key parameters
12,000 TPH ship loading; 4 berths

Design leadership

  • Master planning and export corridor layout
  • Crushing plant and mine interface engineering
  • Phased production from 10 to 100 Mtpa

Materials handling

  • 4 high-capacity conveyor lines
  • Stockyard and transfer systems
  • 12,000 TPH ship loading facility

Port & marine

  • 4 dedicated berths
  • Vessels of 200,000, 100,000 and 50,000 DWT
  • 10,000 DWT barge operations
28
Design model: port, stockyard and storage
Timor-Leste
Gold & Copper Mining Development: Feasibility StudyDesign render
Project 29 / 32
Studies, Design & Supervision

Gold & Copper Mining Development: Feasibility Study

Indonesia
Design study
Role
Consultant
Key parameters
Crushing, 3.1 km conveyor, heap leach
Period
2024

Process

  • Crushing circuit, scalable and modular
  • Heap leach and containment, GISTM aligned
  • Agglomeration and treatment, ICMC compliant

Materials handling

  • 3.1 km overland conveyor
  • Relocatable grasshopper conveyor system
  • Wear-resistant chutes

Infrastructure

  • Balanced cut and fill; drainage
  • Non-process infrastructure
  • Bankable, investment-ready framework
29
Design model: crushing and conveying
Indonesia
CPO Mill & Port DevelopmentDesign render
Project 30 / 32
Studies, Design & Supervision

CPO Mill & Port Development

Jambi, Sumatera
Design study
Role
Engineering consultant
Key parameters
30,000 DWT jetty design

Site investigation

  • Topography and bathymetry
  • Onshore and offshore soil investigation
  • Current, wave and river tidal investigation

Design

  • Port feasibility and master plan
  • 30,000 DWT jetty with dolphins, mooring and berthing
  • CPO flow from storage to tanker loading

Deliverables

  • Warehouse, workshop and camp design
  • Jetty, civil, piping, mechanical, electrical, instrumentation
  • BOQ and tender documents
30
Master plan and jetty model
Jambi, Sumatera
Mess, Drainage Tunnel & Fuel Facilities
Project 31 / 32
Studies, Design & Supervision

Mess, Drainage Tunnel & Fuel Facilities

Central Kalimantan
Ongoing
Role
Design & supervision
Key parameters
500-person mess; tunnel across 3 rivers
Period
2025–2026

Design

  • Feasibility study and technical validation
  • Concept and preliminary engineering
  • 500-person mess; master plan for 550 people

Infrastructure

  • Drainage tunnel traversing three rivers
  • Flood-resilient bridgeworks
  • Fuel storage and floating fuel jetty

Utilities & supervision

  • MEP, telecom, water supply, wastewater and treatment
  • Technical advisory through construction
31
Design drawings and site investigation
Central Kalimantan
Project 32 / 32
Studies, Design & Supervision

Hospital, 17 Floors, 39,980 m²

Solo, Central Java
Role
Multidisciplinary engineering
Key parameters
17 floors; 39,980 m²

Building

  • Structure and architecture
  • Elevators

MEP

  • Mechanical and plumbing
  • Electrical and ELV
  • HVAC

Life safety

  • Fire systems
  • Coordinated multi-discipline delivery
Hospital, 17 Floors, 39,980 m²Hospital, 17 Floors, 39,980 m²Hospital, 17 Floors, 39,980 m²Hospital, 17 Floors, 39,980 m²Hospital, 17 Floors, 39,980 m²Hospital, 17 Floors, 39,980 m²